What we did

The Knottingley project was one of many where Gridworx offered a full turnkey solution to rebuild an 11 kV overhead power line. Over 200 poles were replaced, 18km of copper wire was removed and replaced with 50/100mm² AAAC, 10 transformers were changed and all aerial switches and auto reclosures were upgraded. All works were conducted whilst working closely with landowners, farm owners and local residents to minimise disruption.